There's about 16 hours of machining in each intake.  The first operation is a little over 3 hours, and finishes the bottom of the manifold.  The second operation is done with a different fixture setup, and takes a little over 12 hours.  The setup to do the long machining operation takes a while, which is why I'm running all the manifolds through the first operation first, before changing the setup.